Just-in-Time Scheduling in Two-Stage Flexible Flow Shops
Published in European Journal of Operational Research (EJOR), In Press., 2026
We study the two-stage flexible flow shop problem with a just-in-time objective, proving strong NP-hardness for the unweighted case and developing pseudo-polynomial, parameterized, and approximation algorithms for several structural settings.
Recommended citation: Heeger, K., Hermelin, D., Itzhaki, Y., Schieber, B., and Shabtay, D. (2026). Just-in-Time Scheduling in Two-Stage Flexible Flow Shops. European Journal of Operational Research.
Download Paper | Download Slides | Download Bibtex
